Positive Babel Mural Day 9

Day 9 at the Positive Babel Mural. Spent the majority of the detail working through details and bringing in the bush and water line layer.
Day 9 at the Positive Babel Mural. Spent the majority of the detail working through details and bringing in the bush and water line layer.
Recent Comments